Appendix

PREFACE SECTION 1:
Overview
SECTION 2:
Services
SECTION 3:
Commissioning
SECTION 4:
Process
APPENDIX
   
APPENDIX
Specific Incentives
Electric Chillers
Gas Cooling Equipment
Electric Unitary HVAC
Ground Source Heat Pump
Variable Freq. Drives
Gas Water Heating
Gas Heating
Premium Motors
Prescriptive Lighting
LED Signal Lamp
Lighting Control
Performance Lighting
Custom Gas and Electric
Technical Study Proposal Template
Comprehensive Design Support Agreement
A. Specifications for Brainstorming Session
B. Specifications for Simulation
C. Specifications for Measure Design
Utilities Territory Maps
1. Electric Utilities Territory Map
2. Gas Utilities Territory Map
 
New Jersey SmartStart Buildings Program
Custom Measure Opportunities
Application or Energy End Use Current Design Practice Or Baseline Practice Possible Energy-Efficiency Improvements
Window and Skylight Glazing 0.78 for windows 10% or less of total wall area

0.59 for windows between 10% and 30% of total wall area

0.52 for windows greater than 30% of total wall area

0.46 in curtain walls, atrium and skylights

0.51 for windows 10% or less of total wall area

0.44 for windows between 10% and 30% of total wall area

0.41 for windows greater than 30% of total wall area

0.35 in curtain walls, atrium and skylights

Air Distribution in all building types Constant volume distributed HVACsystems VAV Distribution Systems
Fume hood exhaust systems VAV and VFD supply and exhaust distributed HVAC systems Improvements above this baseline
Water Source Heat Pump Systems Constant flow water loop

Forced draft cooling tower with constant speed centrifugal fan

Variable flow water loop with VFD

Cooling tower with VFD or evaporative cooling tower with or without VFD

Chilled Water Plant (new and existing) Chiller water reset based on return water temp

Primary/Secondary pumping with constant speed pump

Cooling towers with multiple fans or dual fans with single speed.

Constant flow condenser water pump system

Chiller sequencing controls on load

No heat-x-changers

No thermal storage

Chilled water reset based on building HVAC loads and discharge air temps

VFD's on pumps or multiple
sequenced high efficiency pumps on secondary distribution system

Two speed motor upgrades, VFD's, and control for multiple cells

VFD's on condenser water pump system

Optimization chiller sequencing controls based on load and overall operation kW/ton

Building Controls No EMS (EMS is defined as an energy management system that controls multiple technologies.) Controls on more than one technology and must have a central controller
Boiler equipment (greater than 1500 MBH) Constant speed feed water pumps

Constant speed forced draft fans

VFD's on feed water pumps with automatic pressure controls

VFD's on draft fans with automatic pressure controls

Modulating Burners

Package Humidification Electric resistance steam generators Ultrasonic humidification
Retail display refrigeration Multiplexed refrigeration racks

Constant speed on lead compressors

Plate and frame sub-coolers

Floating head pressure controls

Demand defrost controls

T8's for case lights

Air cooled condensers

Screw compressors

Case doors with anti-sweat heat controls

Humidity controls with reheat

Refrigeration heat recovery for DHW

Self contained TEV (thermalÊ expansion valves)

Rack type refrigeration comp.

VFD on lead compressor

Evaporative condensers VFD's on condenser fans

Scroll compressors

Heater doors (triple pane)

Heat pipe on HVAC unit with coil bypass

Low temperature air distribution

Electronic controlled TEV

Distributed refrigeration systems (no pumps, smaller diameter pipes)

Other commercial or Industrial refrigeration Evaporative cooled condensers

Standard size evaporative coils and controls

Single-stage compressor system

Floating head pressure controls, electric defrost control, and sub coolers

Standard design cooling equipment and controls sequences

Oversized evaporative condensers with VFD's on evaporative condenser fans

Oversized/lower fan HP evaporative coils

Evaporative fans on/off control

Multi-stage compressor systems

Oversized cooling equipment with thermal shifting capacity

Gas engine driven compressors

Desiccant dehumidification not covered in prescriptive

Waste water treatment and fresh water plants Fine bubble aeration with multi-stage centrifugal blower and constant speed motors, VFD's on all pumps 25 HP and larger, constant speed on all pumps 25 HP or less, VFD's on ID fans and fume control system  
Ice Rinks Low E ceilings

Water-cooled electric chiller

Multi-stage brine pump (smart drive)

Floating head pressure controls down to 75 deg F

Gas engine driven compressors

Desiccant dehumidification not covered in prescriptive

Ice temperature reset based on occupancy/use

Plastic Injection Molding Machines Enhanced hydraulic operated with

VFD's on motor

All electric machine but may include an upgrade to existing chilled water plant
Air compressors (under 130 PSI) Incentives available only for participants in the compressed air optimization program in serving cooling load  
Interior lighting See Performance Lighting Approach.  
Exterior Lighting See Performance Lighting Approach.  
Lighting controls Only measures in present program will receive an incentive. See building controls for custom.