All paperwork for the Renewable Energy Incentive Program (REIP) will be accepted from 9 am - 4 pm at 75 Lincoln Highway, Suite 100, Iselin, NJ, 08830.  All paperwork may only be submitted by mail or in person.  Paperwork will not be accepted via fax or e-mail.

Submit an Application Packet

Biopower Application Packet
NOTICE: Applications are no longer being accepted for the FY 2014 Sustainable Biopower Competitive Solicitation. Information on the next Solicitation will be posted here at the appropriate time.

Biopower Solicitation Feb. 20, 2014

The above link for the Biopower solicitation includes Appendices A through D. These forms are also posted separately below for those who need to reprint a specific form.

Appendix A - Biopower Application Form
Appendix B - Biopower Application Checklist
Appendix C - Biopower Technical Worksheet
Appendix D - Milestone Reporting Form for Sustainable Biopower Projects

The Milestone Reporting Form must be submitted by the Applicant as a baseline report with the REIP Application Packet and quarterly thereafter, including any extensions if applicable, that may be granted to the initial approval period, until the Final As-Built Packet is submitted. Quarterly reports are due within two weeks of the end of the quarters ending on March 31, June 30, September 30 and December 31. Biopower projects approved prior to 12/31/13 should also complete this form as instructed above.

Wind Application Packet
NOTICE:
The wind rebate program is temporarily on hold for new applications 

Submit a Final As-Built Packet for Wind or Biopower

Once the system is installed, has passed the local inspection, and received interconnection from the utility, the system is ready to be scheduled for a program inspection.

Applicants must submit a complete Final As-Built Packet as per the Final As-Built Checklist. This is applicable for all  biopower projects participating in the REIP regardless of project approval year. A complete packet must be submitted to the Market Manager prior to the project expiration date. If your system will not be completed prior to the expiration date, you may be able to apply for an extension. Review the REIP biopower project extension policy to see if you are eligible. The EDC notification is the only document that can be submitted after the expiration date. However, the project will not be scheduled for an inspection or receive an inspection waiver until a complete Final As-Built Packet  has been received.  Therefore, until the system has passed inspection or received the waiver letter, it will not receive an NJ certification number, which is needed to generate RECs. 

The Final As-Built Packet includes:

Program Contacts

Correspondence and inquiries should be directed to:

Renewable Energy Incentive Program
New Jersey's Clean Energy Program
c/o Conservation Services Group
75 Lincoln Highway, Suite 100
Iselin, New Jersey 08830
Phone: 866-NJSMART (866-657-6278)
Email:  njreinfo@njcleanenergy.com


Solar Installation Counter

Find a Trade Ally

Find a Trade Ally

Applications and Brochures - Download Program Materials

Learn About Solar Energy


Follow Us: Become a Facebook Fan!Follow us on Twitter!