Thousands of New Jersey homeowners, businesses, and municipalities are incorporating clean, renewable energy into their everyday lives with help from New Jersey's Clean Energy ProgramTM.  You too can take advantage of this program and realize tremendous savings in both energy and money.

Getting Started
To be eligible for a NJREMI incentive, you must begin by applying to the SREC Registration Program (SRP).  The SRP technical worksheet includes NJREMI eligibility information.  There are no stand-alone NJREMI application forms. The current NJREMI Program will end on December 31, 2011 and will be replaced by the NJEDA's Clean Energy Manufacturing Incentive (CEMI) Program.

NJREMI eligible projects must meet all requirements below to receive an NJREMI payment before the program is transitioned:

The panels, inverter or racking system must be approved to participate in NJREMI prior to Interconnection (the official date the EDC authorized the system to be energized)

The Final As-Built packet must be submitted after the product was approved to participate in NJREMI incentive

The Final As-Built packet must include Proof of Purchase documentation:

  • The project must have received an NJCEP REIP approval letter or SRP project acceptance letter prior to December 31, 2011.
  • The project must submit a Final As-Built package demonstrating full compliance with the NJREMI requirements. The complete Final As-Built package must be received on or before the earlier date of:
    • Expiration date listed in the original project approval or acceptance letter or
    • March 31, 2012
  • The Final As-Built package must include the following in order to be eligible for the NJREMI incentive:
    • If Installer or customer purchased NJREMI product directly from manufacturer:
      • Proof of equipment receipt or paid invoice from manufacturer. This invoice must include details about the product sold for that site, site host contact, installation address, kW installed, and date of purchase (Note: Date of Purchase cannot be before the racking, panel, or inverter was approved to participate in the NJREMI Program)
    • If installer or customer purchased the NJREMI product from the distributor:
      • The invoice from NJREMI manufacturer to the distributor showing that the panels were purchased ( this is fine to be a large bulk purchase)
      • Proof of equipment receipt or paid invoice from the distributor to the installer. This invoice must include details about the product sold for that site, site host contact, installation address, kW installed, and date of purchase (Note: Date of Purchase cannot be before the racking, panel, or inverter was approved to participate in the NJREMI Program)

REIP Application Form - if project was approved in SRP to inform Market Manager of incentive recipient

NJ Tax Clearance Certificate – only needed if the system owner is a farm or a commercial or non-profit entity

Program Contacts
Renewable Energy Manufacturing Incentive program correspondence and inquiries should be directed to: