New Jersey State Seal

Find a Program



Solar Installations


Find a Solar Trade Ally


Become a Solar Trade Ally


Program Literature

Applications and Brochures - Download Program Materials

Solar Energy

Learn About Solar Energy

Follow Us: Become a Facebook Fan!Follow us on Twitter!

Jersey Atlantic Wind

The 7.5 MW Jersey Atlantic Wind Farm is the first wind farm to be built in New Jersey, and the first coastal wind farm in the United States.  The wind farm is located in Atlantic County, New Jersey and is visible to more than 30 million visitors each year from downtown Atlantic City and the Atlantic City Expressway. 

The project produces approximately 19 million kWh of emission-free electricity per year, which is enough emission-free energy to power over 2,000 homes. The electricity is used by both the Atlantic County Utiltiies Authority (ACUA) Wastewater Treatment Plant and delivered to the regional electric grid.

 

Find a Program



Solar Installations


Find a Solar Trade Ally


Become a Solar Trade Ally


Program Literature

Applications and Brochures - Download Program Materials

Solar Energy

Learn About Solar Energy

Follow Us: Become a Facebook Fan!Follow us on Twitter!


New Jersey State Seal