New Jersey State Seal

Find a Program



Solar Installations


Find a Solar Trade Ally


Become a Solar Trade Ally


Program Literature

Applications and Brochures - Download Program Materials

Solar Energy

Learn About Solar Energy

Follow Us: Become a Facebook Fan!Follow us on Twitter!

REIP EPBB Wind Program

Wind Application Packet

NOTICE: The wind rebate program is temporarily on hold for new applications 

Submit a Final As-Built Packet for Wind

Once the system is installed, has passed the local inspection, and received interconnection from the utility, the system is ready to be scheduled for a program inspection.

Applicants must submit a complete Final As-Built Packet as per the Final As-Built Checklist. A complete packet must be submitted to the Market Manager prior to the project expiration date. If your system will not be completed prior to the expiration date, you may be able to apply for an extension. The EDC notification is the only document that can be submitted after the expiration date. However, the project will not be scheduled for an inspection or receive an inspection waiver until a complete Final As-Built Packet  has been received.  Therefore, until the system has passed inspection or received the waiver letter, it will not receive an NJ certification number, which is needed to generate RECs. 

The Final As-Built Packet includes:

Program Contacts

Correspondence and inquiries should be directed to:

Renewable Energy Incentive Program
New Jersey's Clean Energy Program
Phone: 866-NJSMART (866-657-6278)
Email:  njreinfo@njcleanenergy.com

Find a Program



Solar Installations


Find a Solar Trade Ally


Become a Solar Trade Ally


Program Literature

Applications and Brochures - Download Program Materials

Solar Energy

Learn About Solar Energy

Follow Us: Become a Facebook Fan!Follow us on Twitter!


New Jersey State Seal